Proposed Plan Change 3B (Pomahaka catchment minimum flow) had legal effect from 16 August 2014.

Operative Plan Change 3B (Pomahaka catchment minimum flow) has full legal effect from 1 June 2015.

View the Operative Plan Change 3B (Pomahaka catchment minimum flow) (1 MB)
View the Public Notice (120 KB)
Map B Index (2 MB)
Map B11 (3 MB)
Map B13 (3 MB)
Map B15 (2 MB)
Map C Index (1 MB)
Map C22 (3 MB)
Map C23 (4 MB)

 

Plan Change 3B (Pomahaka catchment minimum flow) Archive

Proposed Plan Change 3B (Pomahaka catchment minimum flow) introduced a primary and supplementary allocation and minimum flow regime for the Pomahaka catchment. It alsoestablished a ribbon aquifer where the groundwater is considered as surface water. Council notified Proposed Plan Change 3B (Pomahaka catchment minimum flow) on Saturday 16 August 2014 and released its decisions on Saturday 14 February 2015. 

Proposed Plan Change 3B (Pomahaka catchment minimum flow) has had legal effect from 16 August 2014. It was made fully operative on 1 June 2015. 

Previous steps in the process